US 60
BELL ROAD


Projects Description

This project required strong schedule monitoring, managing the various phases to accommodate the building of the bridge above the roadway. This project included installation of underground electrical duct banks, conduit (2” PVC, 2.5” PVC) fiber optic communications equipment, conductors for light poles, CCTV composite cable, cast in place lighting, traffic signals, camera installation, calibration, installed control cabinets for all signals. This work was all self-performed by Rural Electric.

Project Location: Phoenix, AZ
Client: Coffman Specialties
Contract Value: $3,053,903
Rural Electric’s Role: Subcontractor