Tolleson – Meter Vault Diversion Structure


Projects Description

This new diversion structure was constructed to deliver water to the Tres Rios Environmental Wetlands Project and the Palo Verde Generating Station. Project elements included 60′′ flowmeters, control systems and fiber optic communications

Dry Utilities, Fiber Optic, Industrial Instrumentation and Controls

Client: PCL Construction
Rural Electric’s Role: Subcontractor