Drop 2 Storage Reservoir Canal & Structures


Projects Description

Rural Electric constructed power distribution and control systems for the operation of 8 large flow control gates at the Drop 2 Reservoir System. Project elements included two 84″ time transit flow meters, gate controls, trash rake controls, canal flow monitoring, reservoir level monitoring, power distribution and standby power systems.

OWNER: Bureau of Reclamation

GENERAL CONTRACTOR: Ames Construction

LOCATION: El Centro, CA

YEAR COMPLETED: 2010

MARKET: Industrial

SCOPES OF WORK:

  • Dry Utilities
  • Fiber Optics
  • Lightning Protection